We use cookies to enable all functionalities for best performance during your visit and to improve our services by giving us some insight into how the website is being used. Continued use of our website without having changed your browser settings confirms your acceptance of these cookies. For details please see our privacy policy.
×

Case Share 3

Views: 109     Author: Site Editor     Publish Time: 2018-09-06      Origin: Site

Case Share 3:

No.6 Jixi City, Heilongjiang Province

Instrument model : PQWT-TC300

M N Electrode equidistance: 10 m        Point Distance: 1 m


Analysis : Well position drilled at the points 2 , the surface layer of 21 meters, the sandstone layer within 40 meters , the granite is at 40 meters to 150 meters , about 35 meters touch the water, the second layer of water at 100 meters, the final well 150 meters, with the water quantity of 7.5 cubic meters / hour