We use cookies to enable all functionalities for best performance during your visit and to improve our services by giving us some insight into how the website is being used. Continued use of our website without having changed your browser settings confirms your acceptance of these cookies. For details please see our privacy policy.
×

Case Share 5

Views: 83     Author: Site Editor     Publish Time: 2018-09-06      Origin: Site

Case Share 5

No.10 Jixi City, Heilongjiang Province

Instrument model : PQWT-TC300

M N Electrode equidistance: 10 m        Point Distance: 1 m


Analysis : Well position drilled at the points 11 , the surface layer of 5.5 meters, the red sandstone layer within 40 meters , the limestone-based is at 40 meters to 120 meters , about 45 meters touch the water, the second layer of water at 90 meters, the final well 140 meters, with the water quantity of 5.5 cubic meters / hour


Point 13 is good point to drill, which is the same geological structure.