Views: 115 Author: Site Editor Publish Time: 2018-09-06 Origin: Site
Case Share 3:
No.6 Jixi City, Heilongjiang Province
Instrument model : PQWT-TC300
M N Electrode equidistance: 10 m Point Distance: 1 m
Analysis : Well position drilled at the points 2 , the surface layer of 21 meters, the sandstone layer within 40 meters , the granite is at 40 meters to 150 meters , about 35 meters touch the water, the second layer of water at 100 meters, the final well 150 meters, with the water quantity of 7.5 cubic meters / hour