We use cookies to enable all functionalities for best performance during your visit and to improve our services by giving us some insight into how the website is being used. Continued use of our website without having changed your browser settings confirms your acceptance of these cookies. For details please see our privacy policy.
×

Case Share 4

Views: 86     Author: Site Editor     Publish Time: 2018-09-06      Origin: Site

Case Share 4:

No.7 Jixi City, Heilongjiang Province

Instrument model : PQWT-TC300

M N Electrode equidistance: 10 m        Point Distance: 1 m


Analysis : Well position drilled at the points 5 , the surface layer of 5.5 meters, the sandstone layer under 30 meters , the limestone-based is at 30 meters to 126 meters , about 25 meters touch the water, the second layer of water at 110 meters, the final well 126 meters, with the water quantity of 6.5 cubic meters / hour.