Views: 92 Author: Site Editor Publish Time: 2018-09-06 Origin: Site
Case Share 4:
No.7 Jixi City, Heilongjiang Province
Instrument model : PQWT-TC300
M N Electrode equidistance: 10 m Point Distance: 1 m
Analysis : Well position drilled at the points 5 , the surface layer of 5.5 meters, the sandstone layer under 30 meters , the limestone-based is at 30 meters to 126 meters , about 25 meters touch the water, the second layer of water at 110 meters, the final well 126 meters, with the water quantity of 6.5 cubic meters / hour.