We use cookies to enable all functionalities for best performance during your visit and to improve our services by giving us some insight into how the website is being used. Continued use of our website without having changed your browser settings confirms your acceptance of these cookies. For details please see our privacy policy.
×

Case Share 1

Views: 194     Author: Site Editor     Publish Time: 2018-09-06      Origin: Site

Case Share 1:

No.2 Jixi City, Heilongjiang Province

Instrument model : PQWT-TC300

M N Electrode equidistance: 10 m        Point Distance: 1 m


Analysis : Well position drilled at the points 5 , the surface layer of 15 meters, the sandstone layer within 40 meters , the limestone-based is at 40 meters to 150 meters , about 15 meters touch the water,  the second layer of water at 50 meters, the final well 150 meters, with the water quantity of 15 cubic meters / hour


From the below profile map /curve, point 20 is also good point for drilling, which at the crack of the two rock and the water depth is at 150-180meters.