Case Share 1:
No.2 Jixi City, Heilongjiang Province
Instrument model : PQWT-TC300
M N Electrode equidistance: 10 m Point Distance: 1 m
Analysis : Well position drilled at the points 5 , the surface layer of 15 meters, the sandstone layer within 40 meters , the limestone-based is at 40 meters to 150 meters , about 15 meters touch the water, the second layer of water at 50 meters, the final well 150 meters, with the water quantity of 15 cubic meters / hour
From the below profile map /curve, point 20 is also good point for drilling, which at the crack of the two rock and the water depth is at 150-180meters.