Views: 126 Author: Site Editor Publish Time: 2018-09-06 Origin: Site
Case Share 2:
No.4 Jixi City, Heilongjiang Province
Instrument model : PQWT-TC300
M N Electrode equidistance: 10 m Point Distance: 1 m
Analysis: Well position located at the points 21 , the surface layer of 6 meters, the sand layer within 30meters , the limestone-based is at 30 meters to 130 meters , about 40 meters touch the water, the second layer of water at 90 meters, the final well 130 meters, with the water quantity of 10 cubic meters / hour